To deliver electric power to its destination – industries and other ventures that required ‘force’, as well as residential or service-providing buildings that demanded ‘light’, hence the name ‘force and light’ – a considerable investment was necessary in the installation of an extensive network throughout the city. The distribution of electric power from the Frei Caneca station was carried out through an underground network, in the central area of the city – which was undergoing a sharp process of modernization – and through an extensive overhead network, for the South and North zones. These poles carried high and low voltage energy and also telephone cables, another service brought by Light to Rio de Janeiro and which will be addressed further ahead, in another room of this exhibition. Access to electric power caused one of the greatest revolutions of civilization and a radical change in habits and customs; countless novelties emerged. In the photograph, the number of men employed in the placement of a concrete pole is striking.
Colocação de poste de concreto - Abril de 1930 - Fotógrafo não identificado
The 1908 photograph, likely taken by E. A. Mortimer, who provided services to Light at the beginning of the 20th century, received a textual addition in English alongside the poles and cables – clarifying the functions of each of the elements. One can see the high and low voltage network cabling, fuses and transformers, the trolley power cable, and telephone cables and wires. These poles served only to support the cables; for lighting, one sees a simple pole, close to the one that supports the transformer. In the background of the image and to the right, the Babilônia stone, and in the left corner, far in the background, is the Grajaú stone.
Overhead Construction – Rua Haddock Lobo
In the photograph taken on Amaro Cavalcanti street, in the direction of Todos os Santos, one can see the use of the same pole to support various electricity cables, in addition to the light fixture. The telephony poles run in parallel, further to the left, on the other side of the train line (which is not seen in the image). In the background, one can see the basilica Imaculado Coração de Maria.
Poste de iluminação pública com cruzetas de madeira carregando 24000 V – outubro de 1923 – Augusto Malta
In the 1923 photograph, of an important road in Bangu [the current avenida de Santa Cruz, perhaps], we observe the poles for high-voltage cables and wires on both sides of the path, but we do not see any streetlights. Public lighting was slow to arrive in the more distant localities from the city center, in the northern zone. There is no sign of tram tracks either, on this road. But when we pay attention to the ground just ahead of the larger pole, we observe that a rail (for a mule-drawn tram, certainly) crosses the road and passes through the gate installed in the middle of the extensive wall, on the left side of the image. And inside there, there is lighting; we can see the poles with lamps.
Bangu – 10/10/1923 – Augusto Malta
Certain operations of the Light attracted pedestrians, who were unaware of those ‘gizmos’ used to construct the underground chambers where the large transformers were installed. At the moment of the photograph, the hole was being dug and the earth, dumped into a cart positioned beside the crane, was being moved.
Obra para colocação de transformador - 19/10/1921 – Augusto Malta
Here, an underground chamber on Central Avenue, currently Rio Branco. It is worth noting the aligned employee in the background, who poses for the photographer.
Transformer Vault VII – Avenida Central cor. Rua do Passeio [Cofre de transformador] – Fotógrafo não identificado
Not even the rain prevented the curious from following the installation of a transformer in one of the underground spaces of the city center. While the Light workers concentrated on the heavy operation which involved, furthermore, a good dose of precision, many passersby sheltered under their umbrellas and followed along with evident interest. In this photograph, taken on Treze de Maio street, one can see in the background, to the left, the famous building that housed for many decades the Cordão do Bola Preta, founded in 1918 and considered the oldest carnival block in activity in Rio; the last remnant of the old cordões.
Rede subterrânea – 30/12/1955 – Gerson Rodrigues Géa
A record of the installation work of the Light underground network, between the neighborhoods of Flamengo and the Frei Caneca substation. In the background, the Santa Bárbara tunnel, towards Laranjeiras-Catumbi.
Catumbi-Rede Subterrânea – 28/11/1966 – Gerson Rodrigues Géa
Since the beginning of the 1940s, public policies aimed at the issue of favelas in the city were already being developed. In 1948, the first census of the communities was conducted; there were already 105 favelas and their population was, for the most part, composed of migrants. Much later, in 1979, when Israel Klabin was appointed to take over the city hall of Rio de Janeiro by the then-governor Chagas Freitas, his desire was to create a secretariat of social development that would place emphasis on solving the problems of the favelas – and the precarious supply of electricity was one of the aspects to be tackled, among others. This visual documentation addresses that period, when Light and the municipal government worked together. In the photograph, we see what the old electricity boxes were like, installed at a point where Light's electricity arrived and from which an informal distribution network began to dozens or even hundreds of family units.
Guararapes: Eletrificação – 05/12/1979 – Nilton M. Rebello
This photograph shows how the new installations were being implemented, in replacement of the old wiring, improvised by the residents themselves from a single distant point and brought to their residences in a precarious and irregular manner.
[Acari: Eletrificação] – 09/01/1980 – Nilton M. Rebello
Whenever possible, trucks equipped with agile cranes participated in the operations, entering tiny spaces to proceed with the installation of the heavy concrete poles.
Comunidade do Tibagi e da Estrada do Engenho: Eletrificação – 04/12/1979 – Nilton M. Rebello
The trucks and their cranes could not always participate; transporting the poles across steep slopes and installing them was sometimes a risky operation that involved a lot of effort, involving sophisticated safety measures and a team always committed to the completion of the task.
Guararapes: Eletrificação – 05/12/1979 – Nilton M. Rebello
This image is a beautiful example of the integration between the Light workers and the residents of those communities, who received them with curiosity and attention.
[Guararapes: Eletrificação] – 11/12-1979 – Nilton M. Rebello
What happiness to be able to observe one's own ‘light box’ with the clock indicating the family's energy consumption. From then on, the residents began to receive their electricity bill monthly, thus reaching a new level of citizenship: the proof of residence that they did not have until then and which opened doors to other rights.
Acari: Eletrificação – 09/01/1980 – Nilton M. Rebello
Observe in the photograph the contrast between the precariousness of the shack with its fence and the concrete pole with the metal boxes and their meters, all connected to an impeccable electrical installation. The other rights – such as the right to housing – did not arrive together with the installation of electricity, in most cases.
Nova Aliança e Acari: Eletrificação – 31/01/1980 – Nilton M. Rebello
On the occasion of the delivery of the works, the celebration could not be missing! It certainly involved the community leaders, politicians from the legislative and executive branches; in addition to Light, naturally. The small percussion group on an improvised stage set the tone for the party.
[Comunidade do Tibagi: Eletrificação] – 17/12/1979 – Nilton M. Rebello
- In this image, at an event for the delivery of electrification works, Mayor Israel Klabin is seen on the right, wearing a white suit. During the period he headed the City Hall, he promoted, among other achievements, tax amnesty and improvements to the taxpayer service system, the urbanization of favelas, and the Medical Care Plan for the Center and the West Zone of the municipality. However, he left the municipal leadership in 1980 due to friction with the federal government, following the rejection of his proposal to re-examine the law of the merger between the defunct state of Guanabara and the former state of Rio de Janeiro. He was replaced by Júlio Coutinho. In recent times, Light continues to work alongside various communities in projects aimed at regularizing the energy supply and reducing the monthly bill amount – such as Comunidade Eficiente, aiming for awareness regarding consumption and the donation of equipment and lamps.
[Guararapes: Eletrificação] – 14/12/1979 – Nilton M. Rebello